    This office project was initially presented in 2008, but due to financial crisis it was delayed until late 2013. The ground works that started in September 2013 were the mark project received green light from the investor and construction of the office block was officially opened in February 2014. It is located at Tošin Bunar street in New Belgrade.

    It is a smaller single-use office building with around 2,981 square meters of gross floor area on seven levels. This building includes one underground level and one semi-buried garage with 27 parking lots. The ground floor will level with the main street, with another 4 floors of office space on top. The facade is made of aluminum structure with glass curtain wall.

    The building is also planned for sustainable energy applications, like heating and cooling system using heat pumps with geothermal energy and roof solar panels. The deadline for completion of the building is may 2015.

    The project is investment by “Deneza Invest” from Belgrade, the construction works are performed by “Kooperacija GZR”, while the architectural design was provided by “Zapp” studio.

    Investor

    Deneza Invest

    Location

    Tošin Bunar street, New Belgrade

    Size

    2.981m²

    Deadlines

    May 2015.



    Projekti: Poslednje objave


    Termoizolacija
    EECFA

    Beobuild anketa

    Da li podržavate izgradnju novog Nacionalnog stadiona?

    Beogradsko oko

    Radnicka Interchange

    Belgrade Bypass - General Project

    Prokop Train Station

    Belgrade-Pančevo railway line

    Ostružnica Bridge expansion

    Ada Bridge north access - Lot 1